Build Proposal, Concept Design, Acquire Resources (7/16/2010-8/20/2010):
  • Design concept and solve preliminary design problems (7/16/2010-8/10/2010)
  • Contact potential resources for assistance with Lofts in Space Project (7/16/2010-8/10/2010)
  • Submit Proposal (8/20/2010)
Receive Award Announcement (8/30/2010)
Design Phase (8/30/2010-10/29/2010)
  • Divide team into design groups focusing on key aspects of the project; design of the shell, design of the support structure, internal layout and design, and integration (8/30/2010-9/1/2010)
  • Proceed with group design phase (9/1/2010-10/29/2010)
Concept and System Definition Review (9/30/2010)
Design Finalization (11/1/2010-11/30/2010)
  • Integrate design groups into final design (11/1/2010-11/8/2010)
  • Make necessary adjustments and corrections to design (11/8/2010-11/30/2010)
Manufacturing Preparation (11/30/2010-12/23/2010)
  • Begin ordering long lead-time material for manufacturing of habitat (11/30/2010-12/23/2010)
  • Check design and reassess current project progress, adjust manufacturing schedule accordingly (12/23/2010)
Winter Recess (12/23/2010-1/3/2011)
Manufacturing, Assembly, and Testing Phase (1/3/2011-5/14/2011)
  • Divide team into groups; testing and construction of shell, testing and construction of support structure, and a group to focus on power and light integration, air circulation, as well making sure all groups are able to integrate effectively (1/3/2011-1/10/2011)
  • Proceed with group manufacturing and testing phase (1/10/2011-2/14/2011)
Progress Checkpoint Review #1 (2/14/2010)
Manufacturing, Assembly, and Testing Phase continued (1/3/2011-5/14/2011)
  • Reassess and evaluate manufacturing progress; adjust schedule accordingly (2/14/2011)
  • Continue with group manufacturing and testing phase (2/14/2011-4/1/2011)
Progress Checkpoint Review #2 (4/1/2011)
Manufacturing, Assembly, and Testing Phase continued (1/3/2011-5/14/2011)
  • Reassess and evaluate manufacturing progress; adjust schedule accordingly (4/1/2011)
  • Begin integrating and final assembly of all materials (4/1/2011-4/22/2011)
  • Finalize assembly and inspect finished product, making adjustments where needed (4/22/2011-5/14/2011)
Final Assembly Check/Review/Testing (5/14/2011-6/19/2011)
Head to Head Competition at NASA/JSC (6/20/2011-6/24/2011)
Integration with HDU-Lab (7/1/2011-8/1/2011)
Field Testing (8/1/2011-9/1/2011)

University of Wisconsin-Madison Department of Engineering Physics